Build your dream home - Part 3

Exterior Framing continues

With sub-framed house on the ground floor and external walls and on the contextualization of the team to the roof. Although the roof was rather simple structure with a single step 12/12 and no valleys it was a great processor is only because of the size and height. The house is 32 meters wide and 44 meters in length and outer walls were 11 feet in the great hall. The Wall Street height of 11 meters, leading a ridgeE 'was 27 feet above the floor of the hall. Consequently, the production is necessary to install the ridge pole and rafters. Furthermore, since the period between the top of the walls of the ridge was so long, 2x12s heavy beams needed. Within a week, but the team has completed the installation of roof beams and the house had really began to take shape.

I briefly on the background and exterior walls before moving on.

I decided to use¾ "male and groove plywood instead of OSB particle surface. / As I feared, that the OSB was too sensitive to moisture, are concerned about this, both during construction and household items normally. I was worried that the construction in During snow and ice could lead to damage and deformation.'ve seen this before when OSB was ground into subgroups. I was also worried that it might have during the period of detentionbad water, for example, a dishwasher or washing machine leak, which could also cause damage to the water plant. I also believe that wood is stronger and there would be a more stronger and more rigid.

As for the wording I used 2x6 exterior wall construction. This is typical of New England, as the depth of the wall also allows for higher insulation factors, a necessity in colder climates.

The outer shell of the house

For toilets andElectric contractors usually on a Web site wants the "home" keys. This includes the roof tiles and doors and windows. So my team moved to the door frame once the external structure of the roof and the walls were complete.

As the subway, I again chose plywood for the cabinet, for the same reasons mentioned above. In exterior walls ½ "exterior plywood was used. Top 8.5" External plywood was used. I know that many manufacturersOSB is now used for walls and ceilings, but I still believe that the wood building stronger the way forward.

The effort was to wrap about a week. During this period the doors and windows are presented on the website. Staging reduces the supply of equipment, theft and insurance risks, and maintains a site less crowded. However, as already mentioned, communication is very important if you material "just-in-timeDelivery.

Installation of doors and windows

The installation of doors and windows was a great commitment to this project as a view of the lake house was literally a wall of windows, 32 feet wide and 27 meters high. Much of the technology was the designer for 10 large custom windows, which fit together like a puzzle away. That is, if the windows had arrived on the scene and review found that some of them wereincorrectly specified size built. reached after several meetings with data processing equipment and suppliers of windows and a compromise on sharing the costs of fixing the window. Seller back window of Windows inappropriately large and the crew began installing doors and windows that can be installed. Fortunately, the window manufacturer to the site with windows large enough and in a few days and the construction phase are not lost back. Beat

Completion of the internal structure

with doors and windows, was the team completed the development of internal structure. That was an exciting time, as the room began to really take shape. You will pass through the halls and locker rooms and public areas. Within days, the interior walls were finished and the crew was prepared for the tiles.

I note that the construction of 2x4 was used as insulation on interior wallsnot necessary for the interior walls.

Stagger the roof

The last task before the house could be classified as a "complete" button, was the installation of ceiling tiles. Luckily my team was also able to provide the service to the framework, eliminating the need for another subcontractor.

I chose a tile 30 years of architecture for the quality and look I was trying to do at home.

Although relatively simple from a roof, big enough and the weather wasless hospitable. It took almost two weeks to complete this operation. But with the roof complete, my electric and plumbing are now able to start its work.

In addition to the main house is now structurally complete, the team moved to the development of the garage and under construction. Following the staging of the garage behind the main phase of building a residence, I had the opportunity to have subcontractors work in parallel, but in all other respects.

CrudeElectrical and hydraulic

With the "home buttons" Arise, my friend was presented and electrical installers to undertake a phase adjustment to their posts.

Rough Electrical

I met a few days before at the hotel with the electrical subcontractor for the positioning of outlets and switches to discuss all the lights are. During our discussion to mark the wall studs for the placement of electrical outlets for uscould see the entire wiring. He also scored on the phone and cable in which they live.

During the rough wiring, the electrician install all wiring boxes and ran the wire to the fuse box, where you can find the main panel.

Pipe

As the electrical subcontractor that meets several weeks earlier with the setup. During this meeting, they discussed the form of heat for the home andsuch as bathrooms and kitchen had to stay home. We also talked about the types of accessories, bath, washbasin and toilet. So, if your site has a new location exactly where the supply lines and drain and vent stack. They also fought on all routes for each bathroom and sanitary kitchen.

Within a week both in and electricians had finished their work and have successfully passed theirInspections.

To be continued ....

Part 4 explains the design of "Building Your Dream Home", electrical and plumbing and cooking more. Stay tuned ...